Shedd Stage 5

Construction and Commissioning

shedd_wheel
Click on the SHEDD wheel to navigate between the stages.
Shedd Shedd 0 define Shedd 1 feasibility Shedd 2 - Concept Shedd 3  Finance Shedd 4 - Detailed Design Shedd 5 Construct Shedd 6 Handover Shedd

This stage is where the project is fully realised. The project is on site and is constructed and commissioned. At the end of the stage a fully functional project is formed and is ready for handover.
BACK

SHEDD Stage 5 – Elements

Technical

• Construction Co-ordination
• Construction Monitoring
• Factory Acceptance tests
• As built drawings

Financial

• Periodic Valuation
• Contract Administration

Regulatory

• Construction Method Statements
• Monitoring against planning conditions

Legal

• Construction Management